Spaciotempo Take To The TracksHenlow Greyhound Stadium is one of the country's top greyhound tracks providing all the thrills and excitement of racing every Monday, Friday and Saturday night.Client: Henlow Greyhound Stadium Requirement: Henlow contacted Spaciotempo in September 2005 when they required a temporary building to be installed within the stadium. The temporary building was to be used as a bar, dinning and viewing facility so the excited race goes could enjoy entertainment, food, drink and warmth whilst overlooking the track. The timing was critical as the new building, aptly named the ‘Winning Post‘, was to be fully operational in time for the Christmas party season. Solution: Spaciotempo provided a 15m wide by 25m long temporary building with a 4m eave height. As with all public facilities Spaciotempo installed their superior insulated roof and wall (TempAwall) systems. These sophisticated systems ensure minimal condensation, assist temperature control and eliminate creaks and rattles usually associated with temporary buildings. Working closely together, Henlow and Spaciotempo pulled in experienced sub-contractors and suppliers to turn the ‘shell’ into an attractive, comfortable and functional public facility. These extras included Vinyl tiles, carpet tiles, rails, platforms, gate and ramp for disabled access, lighting, partitions, ceiling, air-conditioning, doors and glazed windows. Benefit: The "Winning Post" was unveiled to the public on Friday 2nd December 2005 and now, open seven days week, is proving its worth as an ideal venue for corporate functions, weddings, birthday parties, discos, comedy nights and musical entertainment. |
![]() |
Go back





