Temporary gym

Spaciotempo temporary gyms are extremely popular in the sport and leisure sector. We have previously supplied temporary gym buildings to businesses such as Real Bodies gym, in order to help them increase the size and number of their exercise classes. Bradford Boxing College also doubled the number of boxers training at their facility thanks to one of our modular gyms. A Spaciotempo temporary gym could help you to boost participation at your facility too.
other-sports7
temporary gym
temporary gym
Temporary Leisure Facilities
other-sports5
other-sports4
other-sports3
other-sports2
other-sports1

Why choose a temporary gym building from Spaciotempo?

At Spaciotempo, we are experienced in turning build projects around quickly and efficiently, meaning a site visit could be booked within 24 hours of placing your initial enquiry. Our temporary gyms are fully functional and ready to use, meaning you can resume your classes or training sessions immediately – perfect if you are worried about losing out on revenue. Temporary gym buildings are a versatile alternative to permanent structures, as they can be reused or relocated if necessary.

Modular Gym Features

Common options available on a Spaciotempo modular gym include the following:

Specialist Sports Flooring

Specialist sports flooring can be a great option if you are planning on using your temporary gym building for a specialist sport, such as netball or boxing. The markings on our specialist flooring make it easier for both training purposes and competitions. Specialist sports flooring can still be useful if you plan to use your structure as a general modular gym due to its slip resistance.

Heating and Cooling System

Optional heating and Cooling systems allow you to reach the optimum temperature in your temporary gym easily and cost efficiently. Spaciotempo has been recognised as being an eco-friendly temporary building specialist. Therefore, our temporary gyms are not only affordable to rent or buy, but also greener to run than a permanent building.

Break Out Areas

Break out areas can also be installed, depending on your personal preference. While some use break out areas as changing room or office areas, another option could be as a first aid room. The versatility with Spaciotempo temporary gym buildings allows you to mould your break out area to your requirements.

If you require further information on our temporary gym buildings, please call us on the number above or email sales@spaciotempo.co.uk and we will be able to advise you on the structures most suited to you.

Listen to our many happy clients

Paul Clifford, Engineering Director
We’ve never used a temporary building before, but it’s already worked out extremely well for us. Not only was it constructed quickly, it looks as good as a permanent building – in fact, I have seen plenty of permanent structures that are not of such good quality - and it is extremely cost effective.
Paul Clifford, Engineering Director
John Evans, Project Manager for RSL
Harwell isn’t as restricted as it once was, but naturally there are guidelines and rules that visitors have to abide by. I have nothing but praise for the way that Spaciotempo staff have worked with us on these temporary buildings and have gone about their business in a safe and controlled manner while on site.
John Evans, Project Manager for RSL
John Mountford, Commodore
It was just great timing that Spaciotempo had only just got its retractable tunnels back from the Olympics when we enquired. Not only does the tunnel suit our purposes perfectly, the fact that it was used at the Basketball Arena over the summer has become a real talking point.
John Mountford, Commodore
Dinos Andreou, Sales and Marketing Director
Stadco is benefiting from the upturn in the fortunes of the vehicle manufacturing sector. Extra business resulted in the need for some additional warehouse space at our Castle Bromwich plant and Spaciotempo was able to react to our requirements very quickly. The beauty of a temporary warehouse is that we can use the space flexibly – renting a building when the market is strong and if the market contracts again then the building can be off-hired. It enables us to manage our needs very effectively.
Dinos Andreou, Sales and Marketing Director
Dave Ruffett, Production Manager
The flexible nature of temporary buildings suits us very well as a company and Spaciotempo is always accommodating of our needs. Most importantly, they react very quickly once we have placed an order for a building. This saves us the time and expense of constructing a new building that may only be used partially during the year
Dave Ruffett, Production Manager
Andy Burrows, Northern Regional Director
From my initial enquiry through the website I have been extremely pleased with the service from Spaciotempo. They have responded quickly and efficiently to all my requests for help with the erection of this much required storage facility. We have booked the building for an initial two years and I very much hope to extend that contract. I have recommended the company across the group for future temporary storage needs as I feel they go the extra mile to meet our needs.
Andy Burrows, Northern Regional Director
David Nijs, Contract Services Manager
From the initial enquiry to Spaciotempo last year – and throughout the ensuing issues with the planners – I have been more than happy with the service we’ve received. They are professional in the extreme and, as soon as the spec was agreed and sourced, they were on site installing the building. This helped us in the busy build up to Christmas as we were able to satisfy demand we may otherwise not have met.
David Nijs, Contract Services Manager
Len Belsher, Manufactuing Manager
Spaciotempo were excellent and timely in their response to our quote request for a temporary production facility. The team is highly proactive and offered solutions where we thought we may encounter problems. They took me to see their other buildings in Scotland which gave me peace of mind about the quality of the structure. Their installation team presented themselves in a highly proficient manner, operated in a safe manner on site and were very co-operative and helpful. The build quality is excellent and many other personnel from Dril-quip have commented on the design solution and the robust building supplied by Spaciotempo. We are delighted with the outcome.
Len Belsher, Manufactuing Manager
David Lloyd Jones, Logistics Manager
We only moved in to our current premises 3 years ago, but business has taken off to the extent that we already need some further space. We were able to work with an excellent local company, Spaciotempo whose team has worked tirelessly to help us solve our storage problem. They came on site to erect the building with no disruption to our business and we have been able to make full use of the temporary space from the moment the building was handed over.
David Lloyd Jones, Logistics Manager
Matt Green, Factory Manager
The temporary buildings have been extremely useful and are full to capacity. There is no way we could have met the demand for our products without the extra storage space that they have given us.
Matt Green, Factory Manager
Chris Synowiec, Managing Director
This was an extremely quick, efficient and effective way of renting a new warehouse, without the significant cost of building somewhere new. What has surprised us is the standard of the temporary building – it’s fair to say that we have got far more than we thought we would.
Chris Synowiec, Managing Director
Fiona Strong, Managing Director
The temporary building allowed our company to grow, even though we were in a situation where we might have been forgiven for turning the work away.
Fiona Strong, Managing Director
James Bridson, Group Warehouse and Distribution Manager
Because it is a straightforward process for us to get a new temporary building up and running, acquiring extra on-site space this way is an approach that is working out extremely well for us.
James Bridson, Group Warehouse and Distribution Manager
David March, Network Development and Quality Director
Customers are pleasantly surprised when they visit the temporary showroom, which is warm and light, with enough room to exhibit three cars and offices at the side for private discussions. It doesn’t feel like you’re in a temporary building when you’re inside and people are very impressed at how it looks and acts like a proper showroom. That is very important to us as we wait to move into our new dealership.
David March, Network Development and Quality Director
David Lowe, Senior Manager
By re-using components as the footprint of the buildings has grown, we have ensured that costs have been kept down and the modular format has made it possible for the final structure to be built in three phases yet remain open plan and appear as one building. The work from Spaciotempo has been seamless and there has been little disruption to our daily business. We have managed to reposition shutter and personnel doors as well as the exterior walling of each building and we’ve added further lighting as the changes have progressed ensuring that the buildings are totally fit for our purpose.
David Lowe, Senior Manager
Sandra Cawthra, Project Executive
The new Welcome Centre at Twycross Zoo, of which the shop is a fundamental part, will put us in the top tier of British Zoos. The success of the shop has led to us purchasing a further two of these durable and sturdy units for our brand new petting area ‘Pets @ Twycross’. Our aim is to teach, educate and bring awareness of the many conservation projects we are involved in and these units from Spaciotempo will allow us to carry out that important work.
Sandra Cawthra, Project Executive
Rick De Kerckhove, General Manager
We have been able to rent the buildings for exactly the length of time they are required, which has not only enabled us to keep the business going but minimises any unnecessary expenditure. Renting a temporary building has proved itself to be a very versatile way of managing our space during our expansion.
Rick De Kerckhove, General Manager
Paul Porter, Boxing Development Officer
There is no doubt that without the building, we wouldn’t be where we are now prior to this we worked across four sites but mainly shared a gym. It was OK, but it wasn’t designed for what we wanted to do. Now we have a gym that has helped us to meet the high demand that we were experiencing. It’s twice as big as the space we had, it is tailor-made for us and we have it for more hours each week.This has enabled us to quadruple our operations and expand into new areas. For just £300,000, not only have we transformed what we are able to do, we now have one of the best boxing facilities in the country.
Paul Porter, Boxing Development Officer
Susan Wojtowicz, Business Manager
“The temporary sports hall is doing a good job for us whilst we plan our future space requirements. At Hampton College we are committed to offering a wide range of activities to encourage participation by all and the solution provided by Spaciotempo enables us to fulfil that commitment”.
Susan Wojtowicz, Business Manager
Tony Burton, Business Manager, Highgate Wood School.
Our exam hall has been extremely well received by students and teachers alike. It is incredible to think that 2 months ago we were at a loss to host our exams and we now have an incredible building which is absolutely fit for purpose. It’s effectively replaced our Assembly Hall during the building works. Staff and students like it so much that they don’t want it to be dismantled. Wish I could afford to retain it!
Tony Burton, Business Manager, Highgate Wood School.
Dwayne Saxton, Principal, Appleton Academy.
The new sports hall looks terrific. We will be opening this facility up for community activities as well as our school sports, so it was critical that it was to a high specification. Spaciotempo has done a great job.
Dwayne Saxton, Principal, Appleton Academy.
Brian Worrall, Headteacher
From a potentially disastrous situation after the fire, we have been very pleased to work with professional companies who found solutions for us that are way beyond our expectations. In fact I can say that when you step into either our gymnasium or theatre you would never know that either was not a permanent structure. Both companies went the extra mile to provide all the additional materials we needed.
Brian Worrall, Headteacher
Danny Moore, Stadium Manager
Our last tunnel provided us with good service so we didn’t hesitate to order the new one from Spaciotempo. It was delivered fully branded and reflects our club colours perfectly. The tunnel really adds to the sense of occasion for the players and for the crowds. We’re delighted with the result.
Danny Moore, Stadium Manager
Gordon Shields, Project Manager
It is imperative that we comply with Health and Safety issues and Spaciotempo reacted promptly to our bespoke requirement. They bent over backwards to come up with a solution quickly and efficiently. The tunnel is a highly visible and important area of the pitch and the new tunnel provides a striking corner piece.
Gordon Shields, Project Manager
Tony Green, Assistant Chief Steward
The tunnel extension gave players and officials a safe passage back to the dressing rooms, allowing stewards to be deployed elsewhere in the stadium. It works really well and is very easy for us to operate.”
Tony Green, Assistant Chief Steward
Paul Reeve, Project Manager
This project has been a long time coming but I am so pleased to finally see the finished article. We are so pleased with the product and service we received from Spaciotempo and this new tunnel will help to vastly improve the level of our International tumblers.
Paul Reeve, Project Manager
Warren Bennett, Retail Manager
We were delighted with the proactive “can do approach” of the Spaciotempo team in delivering an excellent new players entrance tunnel at Deepdale as part of a new sponsorship agreement with Tennents Lager. In a challenging time frame they delivered a quality product at an excellent price. This was much to the delight of the sponsor after assisting with several changes in artwork to find the best visual standout for the brand. We would have no hesitation in recommending Spaciotempo.
Warren Bennett, Retail Manager
Colin Nellist, Stadium Manager
We are tremendously pleased with the players’ tunnel. It gives a real focus to the players on match day and, of course, is great exposure for our sponsors. Everything has come together really well for the new season and we are grateful to Spaciotempo, who worked very hard to turn the tunnel round in time with the right logos in the right places and in the right colours.
Colin Nellist, Stadium Manager
Ian Woolgar, Project Manager, Berthon Boats
The retractable tunnel from Spaciotempo provides us with just the right space to work on renovations. It is very easy to use and has a small footprint when not in use. It provides the perfect protection for yachts and boats that are in for repair and re-fit.
Ian Woolgar, Project Manager, Berthon Boats
Mark Taylor, Managing Director
This was a fantastic opportunity for Spaciotempo to demonstrate its ability to deliver a complicated and high specification installation at a high profile site. The construction criteria and safety considerations meant that our full range of design, building and service skills were required and we are proud to have successfully completed the project and met the client’s needs. To see the structure feature on primetime national television was extremely rewarding after our hard work on this complex project.
Mark Taylor, Managing Director

Call Back

  • This field is for validation purposes and should be left unchanged.
×

Brochure Download

  • For multiple please press CTRL and select the brochure you require.
  • This field is for validation purposes and should be left unchanged.
×

Industrial Brochure Download

  • This field is for validation purposes and should be left unchanged.
×

Sports Brochure Download

  • This field is for validation purposes and should be left unchanged.
×

Tunnels Brochure Download

  • This field is for validation purposes and should be left unchanged.
×

Car showroom Brochure Download

  • This field is for validation purposes and should be left unchanged.
×

Ports and Airports Brochure Download

  • This field is for validation purposes and should be left unchanged.
×