title: "Permanent Loading & Storage Warehouse"
date: 2025-04-24T10:00:00+01:00
author: Jordan Gardner
canonical_url: "https://www.spaciotempo.co.uk/case-studies/stl-logistics"
section: Case Studies
---
![STL Logistics semi permanent warehouse](/uploads/generic/previews/Case-Study-Preview-images/_1920x1280_crop_center-center_none/STL-Logistics-semi-permanent-warehouse.jpg)  

 

  

 

 

STL Logistics

# Permanent Loading &amp; Storage Warehouse

 

 

 

    Streamline Distribution Capabilities 

  185m x 35m x 8m (with 12.5m rafter extensions) 

  Limerick 

 ![line drawing of a building and a circle on top](/uploads/generic/Product-Icons/neivalu.svg) Neivalu 

 

    ## A truly innovative design and installation, crafted to stand the test of time.

The non-standard structure was modified with a rafter extension to form a dock leveller access area to support storage &amp; distribution processes for the Ireland based premier freight provider.

 

   ![STL logo in blue and yellow](/uploads/generic/Case-Studies/STL-Logistics/_AUTOx100_crop_center-center_none/16738/stl_logo_limerick-300x141.jpg)  

 

 

 

 

         ![inside a Innovative rafter extension and dock levellers with three large doors](/uploads/generic/Case-Studies/STL-Logistics/_2800x2000_crop_center-center_none/16744/Innovative-rafter-extension-and-dock-levellers.jpg)  

  ## Requirements

 

Transport specialists STL Logistics of Limerick, Ireland needed a permanent warehouse that was to be modified with a rafter extension to form a dock leveller access area.

With their rapid installation times and ability to design and fit flexible, innovative and bold [temporary &amp; semi-permanent buildings](https://www.spaciotempo.co.uk/temporary-buildings) that are built to stand the test of time, Spaciotempo were the preferred supplier to carry out the works.

 

 

 

 

 

  ## The solution

 

Over 8,000m2 new floor space, divided into two highly functional areas and completely tailored to meet STL Logistics' complex operational needs.

 

 

(01)

### A Building of Two Halves

         ![Dock levellers for lorries to back up to at STL Logistics](/uploads/generic/Case-Studies/STL-Logistics/_1246x625_crop_center-center_none/16755/Dock-levellers-for-lorries-to-back-up-to-at-STL-Logistics.jpg)  

 

The floor space inside the semi-permanent distribution warehouse was divided in two;

The first, a 35m width x 185m length space that forms the main warehouse hanger which will act as a storage facility capable of stacking pallets up to a non-standard 8m eave height right up to the pitched Neivalu apex.

The second, a rafter extension in12.5m width x 125m length which incorporates six openings for dock levellers that streamlines [loading &amp; transportation operations](https://www.spaciotempo.co.uk/temporary-buildings/logistics).

 

 

 

 ![Decorative blurred photo](/dist/images/cs-details-blur-lg.png) 

(02)

### Lattice Bracing

         ![Lattice bracing system inside the non standard structure](/uploads/generic/Case-Studies/STL-Logistics/_1246x625_crop_center-center_none/16756/Lattice-bracing-system-inside-the-non-standard-structure.jpg)  

 

[All Spaciotempo buildings](https://www.spaciotempo.co.uk/temporary-buildings) are manufactured to conform to the highest European wind &amp; snow loading regulations as laid out by the British Standards Institution. However, due to the sheer size and scale of this facility, with a total 8,037.50 m2 internal surface area, the Spaciotempo team dipped into their wealth of expertise and determined that the building required additional structural support, for extra peace of mind.

At every 5m bay a lattice bracing system was added to provide the absolute maximum structural integrity to the building and help to prevent the frame from rattling in high winds, as well as protection against other extreme weather conditions.

 

 

 

 

(03)

### No Challenge too Big

         ![Drone shot of the finished permanent distribution warehouse](/uploads/generic/Case-Studies/STL-Logistics/_1246x625_crop_center-center_none/Drone-shot-of-the-finished-permanent-distribution-warehouse.jpg)  

 

The finished[ permanent distribution warehouse](https://www.spaciotempo.co.uk/temporary-buildings/warehouse) is the largest scale project the Spaciotempo team have ever constructed, demonstrating their ability to take on large, often complex challenges. Despite the challenging nature of the build, we handed the keys over on the completed structure within 4 months.

 

 

 

 ![Decorative blurred photo](/dist/images/cs-details-blur-sm.png) 

 

 

  ## Temporary buildings.   
Lasting solutions.

Be it lack of storage or warehouse space, production or maintenance facilities, or cover for your loading and unloading operations, our structures meet every requirement.

 

 

 

 [Industrial brochure

  PDF download 

 

 ](https://www.spaciotempo.co.uk/brochures/temporary-buildings-lasting-solutions-brochure) [Get a quote

  Online form 

 

 ](https://www.spaciotempo.co.uk/get-a-quote) 

 

 

  

 [ Go to McCarthy Group - Semi-Permanent Link Shelter case study ](https://www.spaciotempo.co.uk/case-studies/mccarthy-group)           ![Industrial loading canopy for Mc Carthy Group](/uploads/generic/previews/Case-Study-Preview-images/_1920x1280_crop_center-center_none/Industrial-loading-canopy-for-McCarthy-Group.jpg)  

 

McCarthy Group

## Semi-Permanent Link Shelter

Next   
Project

 

 

 

 ### Kickstart your build today.

Don’t let space limitations hold back your business growth. Start your project now!

 [ Get a quote   

 ](https://www.spaciotempo.co.uk/get-a-quote) 

### Temporary buildings brochure

Our brochure places a firm focus on your industry. Download for an insight into our capability and to view past examples of projects we’ve delivered.

 [  Download brochure ](https://www.spaciotempo.co.uk/brochures/company-brochure) 

 

### Temporary buildings FAQs

Understand everything there is to know about temporary buildings, from planning requirements to aftercare.

 [  FAQs ](https://www.spaciotempo.co.uk/faqs) 

 

 

 

 

 

 

  &lt;![CDATA[YII-BLOCK-BODY-END]]&gt;