# Temporary warehouse for effective pallet storage

 

 

 

    Warehousing 

  816m2 

  Rochdale 

 

    ## About Tetrosyl

Tetrosyl is Europe’s largest manufacturer and supplier of car care products producing over 2,500 lines, including T-Cut, CarPlan, and Triplewax. With a global reach, their products are supplied to over 100 countries from 4 manufacturing sites across the UK. When additional warehouse space was required at their Rochdale site, they turned to Spaciotempo for a complete solution.

 

   ![Tetrosyl Logo](/uploads/generic/Case-Studies/Tetrosyl/_AUTOx100_crop_center-center_none/22682/TetrosylLogo.jpg)  

 

 

 

 

         ![Tetrosyl 2026 025](/uploads/generic/Case-Studies/Tetrosyl-Rochdale/_2800x2000_crop_center-center_none/Tetrosyl-2026-025.jpg)  

  ## Business Requirement

 

Tetrosyl required a new warehouse structure to increase storage capacity for pallets of finished goods, enabling them to better support growing operational demands.

 

 

With inbound pallet movements on the rise, the existing facilities at Tetrosyl's Rochdale site were no longer able to adapt efficiently during peak periods, creating capacity challenges and delaying operations. The new structure needed to provide a scalable, high‑capacity storage solution that would accommodate the increased number of pallets.

 

 

 

 

         ![Tetrosyl 2026 042](/uploads/generic/Case-Studies/Tetrosyl-Rochdale/_600x600_crop_center-center_none/Tetrosyl-2026-042.jpg)  

 

 

       ![Tetrosyl 2026 035](/uploads/generic/Case-Studies/Tetrosyl-Rochdale/_600x600_crop_center-center_none/Tetrosyl-2026-035.jpg)  

 

 

       ![Tetrosyl 2026 008](/uploads/generic/Case-Studies/Tetrosyl-Rochdale/_600x600_crop_center-center_none/Tetrosyl-2026-008.jpg)  

 

 

       ![Tetrosyl 2026 029](/uploads/generic/Case-Studies/Tetrosyl-Rochdale/_600x600_crop_center-center_none/Tetrosyl-2026-029.jpg)  

 

 

       ![Tetrosyl 2026 055](/uploads/generic/Case-Studies/Tetrosyl-Rochdale/_600x600_crop_center-center_none/Tetrosyl-2026-055.jpg)  

 

 

 

 

 

 

  Previous   

 

 

 

 

 

 

  Next   

 

 

 

  ## The solution

 

 

(01)

### Innovative Design Process

After an initial site visit from [Josh at Spaciotempo](https://www.spaciotempo.co.uk/news-insights/meet-the-team-josh-warren), it was clear that this wasn’t going to be an off‑the‑shelf solution. The structure needed to accommodate a compact racking design that aimed to maximise on-site storage. The best way to do this within the available area of the site was to capitalise on vertical space. Josh was able to navigate this by suggesting a 9m eave height, something new to Spaciotempo as we continue to develop and innovate our product and offering. Due to the limited space, a 24m clear‑span design allowed for a compact, high‑density racking layout, ensuring every square metre of the building's footprint was utilised efficiently.

 

 

 

 ![Decorative blurred photo](/dist/images/cs-details-blur-lg.png) 

(02)

### The Installation

The installation presented a number of challenges, primarily due to the extremely tight elevations in relation to existing buildings and surrounding walling. The specified 9m eave height made the build additionally challenging, becoming the tallest structure Spaciotempo have delivered to date. These factors meant careful planning and precision installation were essential throughout the build process.

With few providers able to deliver warehouse buildings at 9m eave heights, the successful installation demonstrates the technical capability of Spaciotempo's in-house installation teams.

 

 

 

 

(03)

### The finished result

The completed 24m x 34m building delivers 816 square metres of high‑performance warehousing with a full 9‑metre height to the eaves. The structure features single‑sheet steel cladding and an insulated thermo roof to support internal conditions.

With two personnel doors and two electric roller shutter doors, access is smooth and efficient, keeping goods moving without disruption.

More importantly, the warehouse has completely transformed how Tetrosyl handles inbound pallets. The additional capacity provides space for 2,000 pallets, removing pressure during peak periods and eliminating unnecessary pallet handling. Installing a Spaciotempo structure has introduced a flexible storage solution that can grow with the business. Finished goods can now be stored externally in a purpose‑built structure, freeing up space and streamlining operations across the site.

 

 

 

 ![Decorative blurred photo](/dist/images/cs-details-blur-sm.png) 

 

 

## Why choose a temporary building?

 

Temporary buildings provide far more than just extra space. They offer a huge range of benefits to your business.

 

 

\- Rapid Installation: Structures can be installed in as little as 7 days

\- Complete Flexibility: Easy to expand or relocate

\- Cost-Effective: Benefit from lower upfront costs

 

 

 

 

  **“Spaciotempo are a professional and extremely impressive company. The structure has provided a solution to accommodate an increase in our inbound pallet movements that has removed the challenge of flexing capacity demands”**

 

Steve Bond, Warehouse &amp; Distribution Manager, Tetrosyl Group Limited

 

 

 

 

  ## ATC Drivetrain - A Temporary building solution for rapid expansion

Watch the full case study now.

 

 

 [ Watch   

 ](https://www.youtube.com/watch?v=mtRf-zdQoo0) 

 

 

 [Industrial brochure

  Download now 

 

 ](https://www.spaciotempo.co.uk/brochures/temporary-buildings-lasting-solutions-brochure) 

 

 

  

 [ Go to Global Chair Components - Expanding Capacity with a bespoke temporary warehouse solution case study ](https://www.spaciotempo.co.uk/case-studies/global-chair-components)           ![Klip Video Still 2026 02 20 1111am 2](/uploads/generic/previews/_1920x1280_crop_center-center_none/Klip-Video-Still-2026-02-20-1111am-2.jpg)  

 

Global Chair Components

## Expanding Capacity with a bespoke temporary warehouse solution

Next   
Project

 

 

 

 ### Kickstart your build today.

Don’t let space limitations hold back your business growth. Start your project now!

 [ Get a quote   

 ](https://www.spaciotempo.co.uk/get-a-quote) 

### Temporary buildings brochure

Our brochure places a firm focus on your industry. Download for an insight into our capability and to view past examples of projects we’ve delivered.

 [  Download brochure ](https://www.spaciotempo.co.uk/brochures/company-brochure) 

 

### Temporary buildings FAQs

Understand everything there is to know about temporary buildings, from planning requirements to aftercare.

 [  FAQs ](https://www.spaciotempo.co.uk/faqs) 

 

 

 

 

 

 

  &lt;![CDATA[YII-BLOCK-BODY-END]]&gt;