ALPLA UK

REQUIREMENT:

When ALPLA UK, a leading packing company needed more warehousing space, they turned to Spaciotempo for a solution. They required a secure, weather proof, and reliant temporary building to house their bottling stock before production. So, we provided them with a 20m by 35m temporary warehouse on a 6m apex.

SOLUTION:

ALPLA UK, a leading packing company based in Warrington approached Spaciotempo in the need of some additional warehousing space. They required a secure, weather proof, and reliant temporary building to house their bottling stock before production. Additionally, it was very important to the customer that the building fitted in with their other buildings and matched their brand.

With our in-house designer, we created a building that matched their needs and created a secure environment for their equipment. Spaciotempo manufactured and then installed a 20m by 35m temporary warehouse on a 6m apex. This consisted of an aluminium frame, thermo roof and gables, steel clad walling, 4 single personnel exit doors, 12 LED lights and 70m of guttering. Furthermore, to keep the building in line with their brand and to help blend the building in with their current on-site structures we also installed a blue canvas speed door.

Scott Jameson, Spaciotempo’s Managing Director comments, “This is a great example of how Spaciotempo work with our in-house CAD designer and work collaboratively with the customer and help them find the perfect solutions to their requirements.”

Fact File

Who: ALPLA UK
Where: Warrington
Size: 20m x 35m with a 6m apex
Use: Temporary Warehouse
Special Features: Blue canvas speed door to match their other buildings and keep on brand.