BT Cables Manchester

BT Cables required a covered redistribution area to house fibre optic cables for a period of eight months.

A 15m x 20m H3 Hoecker event structure fitted with ex-rental Roder roof skins and gables, new Tempawall and low bay lighting was provided. At the end of the rental contract, BT Cables purchased the building outright.