Foulgers Transport Norwich

A temporary loading canopy was required by Foulgers Transport for a period of six months while an extension was being built on the main factory.

Storage Structures supplied two 15m x 10m H4 Hoecker event structures fitted with C grade Roder roof skins and side walls, bolted to concrete.