Keyline – Temporary Industrial Building

REQUIREMENT:

In response to customer demand, nationwide builders’ merchants, Keyline embarked on a major multi-site operation. When establishing any new site the costs can be extremely high. Thus, they approached Spaciotempo with a brief to provide a cost-effective alternative to a permanent building. We provided them with a temporary industrial building offering the ultimate solution, saving, time and money!

SOLUTION:

For nationwide builders’ merchants, Keyline, as with any major multi-site operation, the cost of establishing a new site can be high. So when they were establishing a site at Lincoln recently, they chose Spaciotempo, temporary building experts. With low upfront costs compared to a permanent build and quick installation due to us installing our own buildings – we provided the ideal 15m by 30m – total area spanning 450spm of temporary storage space and reduced the cost of site set-up. For Keyline, it was important for them that the building was aesthetically pleasing and matched the brand. So, we installed bespoke steel cladding – in the shade of blue, that the brand Keyline represent.

Dan Barker, Area Sales Manager at Spaciotempo explains, “Although our buildings are referred to as “temporary”, their superior engineering and frame size gives them unparalleled durability. This is why for many of our customers, they offer a semi-permanent or even permanent solution, providing the best of both worlds – speed of installation and lower cost solution combined with long-term durability.”

Fact File

Who: Keyline Builders Merchants
Where: Lincoln
Size: 35m x 15m on a 6m eave
Use: Storage of stock
Why: Permanent solution for new site.
Special Features: Bespoke cladding colour for single skin steel walling to match brand colour.