---
title: Temporary Storage For Recycling Process Area
date: 2025-01-16T15:40:00+00:00
author: Rhys Matthew
canonical_url: "https://www.spaciotempo.co.uk/case-studies/cumbria-waste-group"
section: Case Studies
---
![Cumbria Waste 2015 53](/uploads/generic/previews/_1920x1280_crop_center-center_none/Cumbria-Waste-2015-53.jpg)  

 

  

 

 

Cumbria Waste Group

# Temporary Storage For Recycling Process Area

 

 

 

    Industrial Waste Processing Plant 

  25m x 35m x 8m 

  Carlisle, Cumbria 

 ![line drawing of a building and a circle on top](/uploads/generic/Product-Icons/neivalu.svg) Neivalu 

 

    ## Temporary Storage Solution for Cumbria Waste Group’s Recycling Process Area

Cumbria Waste Group, the largest waste disposal and recycling company in Cumbria, required a temporary storage solution to support their [recycling operations](https://www.spaciotempo.co.uk/waste-recycling-buildings). With a commitment to delivering high levels of recycling in a compliant and cost-effective manner, they turned to Spaciotempo for a practical and efficient storage building.

 

   ![Cumbria Waste Group logo](/uploads/generic/Case-Studies/Cumbria-Waste-Group/_AUTOx100_crop_center-center_none/Cumbria-Waste-Group-logo.jpg)  

 

 

 

 

         ![Cumbria Waste 2015 36](/uploads/generic/Case-Studies/Cumbria-Waste-Group/_2800x2000_crop_center-center_none/Cumbria-Waste-2015-36.jpg)  

  ## Requirements

 

Cumbria Waste provides bespoke recycling and waste management services to a diverse customer base, including the public sector and local authorities. As their operations expanded, they needed a temporary structure that could facilitate the recycling process while maintaining their value-for-money objective. The solution needed to provide ample space for waste processing and efficient fleet movement.

 

 

 

 

 

         ![Cumbria Waste 2015 46](/uploads/generic/Case-Studies/Cumbria-Waste-Group/_600x600_crop_center-center_none/Cumbria-Waste-2015-46.jpg)  

 

 

       ![Cumbria Waste 2015 39](/uploads/generic/Case-Studies/Cumbria-Waste-Group/_600x600_crop_center-center_none/Cumbria-Waste-2015-39.jpg)  

 

 

       ![Cumbria Waste 2015 40](/uploads/generic/Case-Studies/Cumbria-Waste-Group/_600x600_crop_center-center_none/Cumbria-Waste-2015-40.jpg)  

 

 

 

 

 

 

  Previous   Spaciotempo’s 875 sqm temporary structure provides essential space for Cumbria Waste’s recycling operations.

 

 The 8m eave height ensures seamless loading, unloading, and waste processing inside the facility

 

 Cumbria Waste’s new storage solution in action, enhancing efficiency in their recycling process

 

 

 

  Next   

 

 

 

  ## The solution

 

To meet the growing demands of Cumbria Waste Group, Spaciotempo provided a high-quality 25m x 35m temporary storage building. The structure, designed to function as a recycling processing area, was installed swiftly to ensure minimal disruption to operations.

 

 

(01)

### Spacious and Efficient Design

         ![Cumbria Waste 2015 41](/uploads/generic/Case-Studies/Cumbria-Waste-Group/_1246x625_crop_center-center_none/Cumbria-Waste-2015-41.jpg)  

 

The 875 sqm temporary facility boasts an 8m eave height, ensuring ample space for loading, unloading, and waste processing. This design allows for smooth movement of Cumbria Waste’s fleet, optimizing workflow within the recycling plant.

 

 

 

 ![Decorative blurred photo](/dist/images/cs-details-blur-lg.png) 

(02)

### Rapid Deployment and Installation

         ![Cumbria Waste 2015 50](/uploads/generic/Case-Studies/Cumbria-Waste-Group/_1246x625_crop_center-center_none/Cumbria-Waste-2015-50.jpg)  

 

Understanding the urgency of the project, Spaciotempo responded promptly to Cumbria Waste’s requirements. The team visited the site, planned the installation, and delivered a fully operational structure within weeks. All work was carried out by Spaciotempo’s in-house qualified operations staff, ensuring safety and compliance.

 

 

 

 

 

 

## Client feedback

 

Cumbria Waste Group praised the efficiency and reliability of Spaciotempo’s service. The ability to quickly provide a high-quality temporary building was instrumental in enhancing their recycling operations.

 

 

 

 

 

  "With lower upfront investment compared to a permanent build, we provided Cumbria Waste with the ideal temporary building solution. We reacted quickly to their enquiry, visited their site, and began installation within a few weeks.

All our temporary structures are delivered, installed, and dismantled by our qualified operations staff, ensuring peace of mind for our clients."

 

Daz Logan, Managing Director

 

 

 

 

  ## Temporary buildings.   
Lasting solutions.

Be it lack of storage or warehouse space, production or maintenance facilities, or cover for your loading and unloading operations, our structures meet every requirement.

 

 

 

 [Industrial brochure

  PDF download 

 

 ](https://www.spaciotempo.co.uk/brochures/temporary-buildings-lasting-solutions-brochure) [Get a quote

  Online form 

 

 ](https://www.spaciotempo.co.uk/get-a-quote) 

 

 

  

 [ Go to OTR Solidboss Worldwide UK Ltd - Semi-Permanent Workshop &amp; Storage Depot case study ](https://www.spaciotempo.co.uk/case-studies/otr-solidboss-worldwide-uk-ltd)           ![Solidboss Worldwide 108](/uploads/generic/previews/Case-Study-Preview-images/_1920x1280_crop_center-center_none/Solidboss-Worldwide-108.jpg)  

 

OTR Solidboss Worldwide UK Ltd

## Semi-Permanent Workshop &amp; Storage Depot

Next   
Project

 

 

 

 ### Kickstart your build today.

Don’t let space limitations hold back your business growth. Start your project now!

 [ Get a quote   

 ](https://www.spaciotempo.co.uk/get-a-quote) 

### Temporary buildings brochure

Our brochure places a firm focus on your industry. Download for an insight into our capability and to view past examples of projects we’ve delivered.

 [  Download brochure ](https://www.spaciotempo.co.uk/brochures/company-brochure) 

 

### Temporary buildings FAQs

Understand everything there is to know about temporary buildings, from planning requirements to aftercare.

 [  FAQs ](https://www.spaciotempo.co.uk/faqs) 

 

 

 

 

 

 

  &lt;![CDATA[YII-BLOCK-BODY-END]]&gt;
