ATC Drivetrain UK
Temporary Building Solution for Rapid Expansion
About ATC Drivetrain UK
ATC Drivetrain UK Ltd is a leading provider of automotive electronics remanufacturing services, specialising in electronic control units (ECUs), testing, and repair solutions for the automotive industry. Since 1988, the company has experienced rapid growth, creating an urgent need for flexible, scalable temporary building solutions to support increased production capacity and meet rising market demand.
Business Challenge
ATC Cannock, a rapidly expanding logistics and supply chain company, required an urgent temporary building solution to accommodate business growth and launch new product lines without the delays of traditional construction.
Dean Newton, Maintenance and Facilities Manager at ATC Cannock, faced a critical deadline. Traditional construction methods would require over 12 months. ATC needed a rapid deployment building solution that could be designed, constructed, and operational quickly enough to support their aggressive growth timeline and prevent revenue loss.
The solution
(01)
A rapid Temporary Building solution
What did the process include?
Site Assessment & Consultation: Comprehensive site visit and needs analysis to understand ATC's operational requirements, space specifications, and site preparation needs for the temporary building installation.
Complete Project Management: Full turnkey service including planning permission applications, regulatory compliance, and project coordination to ensure seamless temporary building delivery.
Bespoke Building Design: Custom-engineered temporary structure designed to exact specifications, ensuring optimal workflow, operational efficiency, and compliance with industry standards.
A Temporary building solution proved essential for ATC's expansion timeline. From approved plans to a fully operational facility took just 1 month—92% faster than traditional construction methods—enabling ATC to capture new business opportunities without delay.
(02)
Results: A Fast, Flexible, Cost-Effective Building Solution.
The temporary building solution delivered exceptional results across three critical business factors—speed, quality, and flexibility—enabling ATC Cannock to maintain a competitive advantage in the logistics sector.
Rapid Installation: The temporary building was fully installed and operational in approximately 1 month—a 92% reduction in construction time compared to traditional building methods (12+ months).
High-Quality Construction: The temporary building delivered by Spaciotempo met all quality standards and operational requirements. Dean Newton, Facilities Manager, confirmed: "I think they've delivered a good quality building in a good time."
Modular Flexibility & Scalability: The modular building design provides significant long-term strategic value, enabling expansion, reconfiguration, or relocation as business needs evolve. Dean noted, "The flexibility of being allowed to add, take away or move the building is a huge benefit."
This adaptable infrastructure ensures ATC can respond quickly to future growth, seasonal demand fluctuations, or operational changes without additional construction costs.
Why Choose Temporary Buildings for Business Expansion
By choosing a Spaciotempo temporary building over traditional construction, ATC Cannock was able to navigate the pressures of rapid business growth and tight deadlines. Spaciotempo's commitment to delivering a high-quality, custom-designed structure in a fraction of the time provided ATC Cannock with a strategic advantage and a flexible asset for their future.
Dean Newton, Maintenance and Facilities Manager, ATC Cannock:
“I would absolutely recommend Spaciotempo. I think they've delivered a good quality building in a good time.”
“The flexibility of being allowed to add, take away or move the building is a huge benefit.”
ATC Drivetrain - A Temporary building solution for rapid expansion
Watch the full case study now.
Industrial brochure
Celtic Travel
Multi-functional workshop facility
Next
Project