Play

Next Project

Industrial loading canopy for Mc Carthy Group

McCarthy Group

Semi-Permanent Link Shelter

Haulage & Link To Existing Warehouse
20m x 30m x 6.5-6.9m
Wrexham, North Wales
Neivalu Neivalu

A fully bespoke build on a sloped site for the service driven logistics specialists.

The large industrial link canopy provides a time-saving and weatherproof connection between the crucial storage and distribution stages of their supply chain.

Mc Carthy Group Logo
Drone picture of articulate lorries and semi permanent link shelter

Requirements

From general haulage to warehousing, McCarthy Group deliver a variety of cost-effective logistics and transport solutions, with operations encompassing haulage, storage and distribution.

The firm approached Spaciotempo with a need to find a sheltered solution with sufficient height to cover double-deck trailers during loading operations. And having recently installed a giant canopy on behalf of Farrell Transport, this requirement fell right within our wheelhouse.

The semi permanent link shelter enables streamlined haulage and distribution tasks
It is capable of accomodating multiple double deck trailers at any one time with ample clearance room to spare

The semi-permanent link shelter enables streamlined haulage and distribution tasks

It is capable of accomodating multiple double-deck trailers at any one time with ample clearance room to spare

The solution

Spaciotempo installed an industrial loading canopy, which provided ample height for multiple double-deck trailers to be loaded or unloaded at any one time.

(01)

Link to Warehouse Operations

Large industrial link canopy

The semi-permanent structure is considered a link building as it is sited immediately adjacent to the businesses existing warehouse at their Wrexham site. 

This easy-access allows forklift trucks to move seamlessly in between the warehouse and canopy, minimising exposure to the elements and thus protecting inbound and outbound goods that pass through this part of the supply chain.
 

(02)

Overcoming Challenging Site Conditions

The semi permanent link shelter was installed on a sloping site

As the site sloped, Spaciotempo had to bespoke design several uprights to ensure the structure ran perpendicular. With legs higher on one side, this also meant site specific calculations were needed, to make sure the canopy was structurally sound and compliant with safe and best practices.

Measuring a sizeable 30m x 20m x 6.5-6.9m, Spaciotempo completed this installation in just 9 days, enabling McCarthy Group to quickly level up their distribution game by cementing their status as a quality focused organisation.
 

Temporary buildings. 
Lasting solutions.

Be it lack of storage or warehouse space, production or maintenance facilities, or cover for your loading and unloading operations, our structures meet every requirement.

Industrial brochure

PDF download

Get a quote

Online form

Inspired Pet Nutrition

Permanent Storage Building

Next
Project

Kickstart your build today.

Don’t let space limitations hold back your business growth. Start your project now!

Get a quote

Temporary buildings brochure

Our brochure places a firm focus on your industry. Download for an insight into our capability and to view past examples of projects we’ve delivered.

Temporary buildings FAQs

Understand everything there is to know about temporary buildings, from planning requirements to aftercare.