MM Freight
Loading Warehouse
Loading & Unloading Warehouse
MM Freight partnered with Spaciotempo to deliver two bespoke modular buildings at their Craigavon depot. Originally seeking a fast and cost-effective solution to support growing chilled goods operations, the success of the initial structure led to a second, larger building being commissioned both now forming an essential part of their permanent infrastructure.


Requirements
As a leading temperature-controlled logistics provider with operations across the UK and Ireland, MM Freight needed to expand chilled distribution capacity at their Northern Ireland depot. They required a fast-turnaround solution that could accommodate high volumes of cross-docking activity, while maintaining temperature control and allowing safe, efficient vehicle loading in all weather conditions.
To support this, they were looking for a partner who could deliver everything in-house from initial design through to installation with minimal disruption to operations.
The solution
Spaciotempo delivered two purpose-built modular structures for MM Freight, both tailored to meet the operational needs of their Craigavon depot. The first structure provided an immediate uplift in chilled cross-docking capacity, while the success of this installation led to the commissioning of a second, larger facility — further increasing throughput and long-term site capability.
(01)
Phase 1: 414m² Temporary Warehouse

The initial 414m² building was installed in just one week and included a 1.5m canopy extension and integrated dock leveller, enabling weather-protected loading and safe, efficient movement of goods. Designed to operate as a chilled distribution hub, the structure was quickly integrated into MM Freight’s daily workflow and became a vital component of their site operations.

(02)
Phase 2: Expansion Through a Second, Larger Structure

Following the smooth delivery and strong performance of the first building, MM Freight commissioned a second 825m² facility to expand their capabilities even further. This larger structure included multiple dock doors, a thermo-insulated blackout roof, and a covered mini canopy to maintain year-round protection. An 8m-wide insulated tunnel was installed to connect both buildings, allowing seamless internal movement between the two units and supporting high-volume, chilled logistics on site.
(03)
Outcome
Spaciotempo completed both builds on time, on budget and to specification, enabling MM Freight to scale their logistics infrastructure without disruption.
Today, the two modular structures are a permanent fixture of MM Freight’s operations in Craigavon, supporting a chilled cross-docking and distribution system that plays a key role in their national supply chain.
Thanks to Spaciotempo’s single-provider model, MM Freight benefitted from:
- Fully customised, operationally aligned solutions
- Rapid deployment across both builds
- Seamless integration between new and existing infrastructure
- Scalable structures that support long-term growth objectives

Temporary buildings.
Lasting solutions.
Be it lack of storage or warehouse space, production or maintenance facilities, or cover for your loading and unloading operations, our structures meet every requirement.
Industrial brochure
Get a quote
Farrell Transport
Permanent Canopy Solution
Next
Project